Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Reduction Ratio | Shaft Diameter (φ) | Output shaft arrangement | Model # (gear center distance) | |
---|---|---|---|---|---|---|---|---|---|
714.51 € | 1 | 20 Days | 10 | 10 | 32 | Upper Right Side | 80 | ||
714.51 € | 1 | 20 Days | 10 | 15 | 32 | Upper Right Side | 80 | ||
663.93 € | 1 | 20 Days | 10 | 20 | 32 | Upper Right Side | 80 | ||
714.51 € | 1 | 20 Days | 10 | 25 | 32 | Upper Right Side | 80 | ||
714.51 € | 1 | 20 Days | 10 | 30 | 32 | Upper Right Side | 80 | ||
663.93 € | 1 | 20 Days | 10 | 40 | 32 | Upper Right Side | 80 | ||
663.93 € | 1 | 20 Days | 10 | 50 | 32 | Upper Right Side | 80 | ||
663.93 € | 1 | 20 Days | 10 | 60 | 32 | Upper Right Side | 80 | ||
1,274.12 € | 1 | 20 Days | 10 | 10 | 38 | At the Lower Left Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 15 | 38 | At the Lower Left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 20 | 38 | At the Lower Left Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 25 | 38 | At the Lower Left Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 30 | 38 | At the Lower Left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 40 | 38 | At the Lower Left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 50 | 38 | At the Lower Left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 60 | 38 | At the Lower Left Side | 100 | ||
1,274.12 € | 1 | Available | 20 Days | 10 | 10 | 38 | At the upper left Side | 100 | |
1,274.12 € | 1 | 20 Days | 10 | 15 | 38 | At the upper left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 20 | 38 | At the upper left Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 25 | 38 | At the upper left Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 30 | 38 | At the upper left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 40 | 38 | At the upper left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 50 | 38 | At the upper left Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 60 | 38 | At the upper left Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 10 | 38 | Lower Right Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 15 | 38 | Lower Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 20 | 38 | Lower Right Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 25 | 38 | Lower Right Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 30 | 38 | Lower Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 40 | 38 | Lower Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 50 | 38 | Lower Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 60 | 38 | Lower Right Side | 100 | ||
1,274.12 € | 1 | Available | 20 Days | 10 | 10 | 38 | Upper Right Side | 100 | |
1,274.12 € | 1 | 20 Days | 10 | 15 | 38 | Upper Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 20 | 38 | Upper Right Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 25 | 38 | Upper Right Side | 100 | ||
1,274.12 € | 1 | 20 Days | 10 | 30 | 38 | Upper Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 40 | 38 | Upper Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 50 | 38 | Upper Right Side | 100 | ||
1,179.27 € | 1 | 20 Days | 10 | 60 | 38 | Upper Right Side | 100 | ||
1,887.24 € | 1 | 20 Days | 10 | 10 | 45 | At the Lower Left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 15 | 45 | At the Lower Left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 20 | 45 | At the Lower Left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 25 | 45 | At the Lower Left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 30 | 45 | At the Lower Left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 40 | 45 | At the Lower Left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 50 | 45 | At the Lower Left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 60 | 45 | At the Lower Left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 10 | 45 | At the upper left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 15 | 45 | At the upper left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 20 | 45 | At the upper left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 25 | 45 | At the upper left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 30 | 45 | At the upper left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 40 | 45 | At the upper left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 50 | 45 | At the upper left Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 60 | 45 | At the upper left Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 10 | 45 | Lower Right Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 15 | 45 | Lower Right Side | 120 | ||
1,773.03 € | 1 | 20 Days | 10 | 20 | 45 | Lower Right Side | 120 | ||
1,887.24 € | 1 | 20 Days | 10 | 25 | 45 | Lower Right Side | 120 |
Loading...
Mounting Division | With Leg | Type | Worm Gear | The presence or absence of motor | No |
---|---|---|---|---|---|
Output shaft type | Solid | Axial direction | Direct axis |
Configure
Basic Attributes
Reduction Ratio
Shaft Diameter(φ)
Output shaft arrangement
Model # (gear center distance)
Type
Filter by CAD data type
Filter by standard shipping days
Optional Attributes