Manufacturer part number: MOP-25C-8-9-BT-KT
Brand: NABEYA BI-TECH
Price: 117.48 €
Delivery time: 9 Days
Allowable Torque Range: 1.01 to 3.00 N•m
Shaft Bore Dia. (machined) D1: 8 mm
Shaft Bore Dia. (machined) D2: 9 mm
Overall Length: 27.2 mm
Normal Torque: 1.2 Nm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
MOP-25C-8-9-BT-KT
Part Number
|
---|
MOP-25C-8-9-BT-KT |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Allowable Torque Range (N•m) | Shaft Bore Dia. (machined) D1 (mm) | Shaft Bore Dia. (machined) D2 (mm) | Overall Length (mm) | Normal Torque (Nm) | Max. Rotational Speed (r/min) | Allowable Lateral Misalignment (mm) | Moment of Inertia (kg・m2) | Additional Work | Keyway | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
117.48 € | 1 | 9 Days | 10 | 1.01 to 3.00 | 8 | 9 | 27.2 | 1.2 | 25000 | 1.5 | 2.2×10-6 | Additional Work Shaft Hole | D2 Hole |
Loading...
Type | Oldham Type | Allowable Misalignment | Angular Misalignment / Eccentricity | Application | Standard / Stepping Motor |
---|---|---|---|---|---|
Maximum Range of Rotation Number(r/min) | 10,001 to 78,000 | Feature | Heat Resistant / Clean circumstance / Vacuum Environment | Body Material | EN AW-2017 Equiv. |
Category | Coupling body | Allowable Lateral Misalignment Range(mm) | 1.1 to 3.0 | Allowable Angular Misalignment(deg) | 2 |
Buffer Part Material | PEEK | Operating Temperature Range(°C) | -20::120 | Structure | Clamping Type |
This page is Oldham couplings / hub clamping, feather key / 1 disc: PEEK / body: aluminium / MOP / NBK, part number MOP-25C-8-9-BT-KT.
You can find the detail information about specifications and dimensions on part number MOP-25C-8-9-BT-KT.
Configure
Basic Attributes
Type
Allowable Torque Range(N•m)
Shaft Bore Dia. (machined) D1(mm)
Shaft Bore Dia. (machined) D2(mm)
Overall Length(mm)
Normal Torque(Nm)
Max. Rotational Speed(r/min)
Allowable Lateral Misalignment(mm)
Additional Work
Keyway
Filter by CAD data type
Filter by standard shipping days
Optional Attributes
Part Number |
---|
MOP-20C-6-8 |
MOP-20C-7-BT-7-BT |
MOP-20C-7-BT-8 |
MOP-25C-9-BT-10 |
MOP-25C-9-BT-10-KT |
MOP-25C-9-BT-9-BT |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Allowable Torque Range (N•m) | Shaft Bore Dia. (machined) D1 (mm) | Shaft Bore Dia. (machined) D2 (mm) | Overall Length (mm) | Normal Torque (Nm) | Max. Rotational Speed (r/min) | Allowable Lateral Misalignment (mm) | Moment of Inertia (kg・m2) | Additional Work | Keyway |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
107.45 € | 1 | 8 Days | 10 | 0.05 to 1.00 | 6 | 8 | 22.1 | 0.7 | 31000 | 1.3 | 7.4×10-7 | Standard Shaft Bore | NA | ||
113.80 € | 1 | 9 Days | 10 | 0.05 to 1.00 | 7 | 7 | 22.1 | 0.7 | 31000 | 1.3 | 7.4×10-7 | Additional Work Shaft Hole | NA | ||
135.51 € | 1 | 9 Days | 10 | 0.05 to 1.00 | 7 | 8 | 22.1 | 0.7 | 31000 | 1.3 | 7.4×10-7 | Additional Work Shaft Hole | NA | ||
107.86 € | 1 | 9 Days | 10 | 1.01 to 3.00 | 9 | 10 | 27.2 | 1.2 | 25000 | 1.5 | 2.2×10-6 | Additional Work Shaft Hole | NA | ||
117.48 € | 1 | 9 Days | 10 | 1.01 to 3.00 | 9 | 10 | 27.2 | 1.2 | 25000 | 1.5 | 2.2×10-6 | Additional Work Shaft Hole | D2 Hole | ||
126.98 € | 1 | 9 Days | 10 | 1.01 to 3.00 | 9 | 9 | 27.2 | 1.2 | 25000 | 1.5 | 2.2×10-6 | Additional Work Shaft Hole | NA |