Manufacturer part number: A10626-0323
Brand: AKAGI
Price: 22.70 €
Delivery time: 15 Days
Main fit tube(or application tube)outside diameter: 20~Less than 30 mm
Material: [Stainless Steel] Stainless Steel (EN 1.4301 Equiv.)
Applicable Pipe Type: [Steel Pipe / Coated Steel Pipe] SGP Pipe
Surface Treatment: NA
Size: SG-20
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
A10626-0323
Part Number
|
---|
A10626-0323 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Main fit tube(or application tube)outside diameter (mm) | Material | Applicable Pipe Type | Surface Treatment | Size | Compatible Pipe Outer Diameter (mm) | Color | |
---|---|---|---|---|---|---|---|---|---|---|---|
22.70 € | 1 | 15 Days | 20~Less than 30 | [Stainless Steel] Stainless Steel (EN 1.4301 Equiv.) | [Steel Pipe / Coated Steel Pipe] SGP Pipe | NA | SG-20 | 27.2 | Ivory |
Loading...
Type | U-Bolt | Number Contained In A Packet(piece) | 1 |
---|
This page is U-Bracket Dip U Bolts / Dip, Stainless Steel U Bolt (SG / CU / SU), part number A10626-0323.
You can find the detail information about specifications and dimensions on part number A10626-0323.
Configure
Basic Attributes
Type
Main fit tube(or application tube)outside diameter(mm)
Material
Applicable Pipe Type
Surface Treatment
Size
Compatible Pipe Outer Diameter(mm)
Color
Filter by standard shipping days
Optional Attributes
Part Number |
---|
A10603-0047 |
A10603-0051 |
A10603-0066 |
A10626-0338 |
A10626-0342 |
A10626-0427 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Main fit tube(or application tube)outside diameter (mm) | Material | Applicable Pipe Type | Surface Treatment | Size | Compatible Pipe Outer Diameter (mm) | Color |
---|---|---|---|---|---|---|---|---|---|---|---|
7.77 € | 1 | 8 Days | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | SG-32 | 42.7 | Ivory | ||
9.71 € | 1 | Available | 6 Days | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | SG-40 | 48.6 | Ivory | |
9.46 € | 1 | 8 Days | 60~Less than 70 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrogalvanizing | SG-50 | 60.5 | Ivory | ||
22.42 € | 1 | 7 Days | 30~Less than 40 | [Stainless Steel] Stainless Steel (EN 1.4301 Equiv.) | [Steel Pipe / Coated Steel Pipe] SGP Pipe | NA | SG-25 | 34 | Ivory | ||
24.79 € | 1 | 9 Days | 40~Less than 50 | [Stainless Steel] Stainless Steel (EN 1.4301 Equiv.) | [Steel Pipe / Coated Steel Pipe] SGP Pipe | NA | SG-32 | 42.7 | Ivory | ||
85.81 € | 1 | 9 Days | 100~Less than 200 | [Stainless Steel] Stainless Steel (EN 1.4301 Equiv.) | [Steel Pipe / Coated Steel Pipe] SGP Pipe | NA | SG-150 | 165.2 | Ivory |