Manufacturer part number: NS7XA1
Brand: KANEMITSU
Price: 39.17 €
Delivery time: 7 Days
Nominal: 7
Outer Diameter: 177.8 mm
dm: 168.8 mm
Shaft hole d maximum diameter: 30 mm
Shaft hole d, pilot hole diameter: 12 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
NS7XA1
Part Number
|
---|
NS7XA1 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Nominal | Outer Diameter (mm) | dm (mm) | Shaft hole d maximum diameter (mm) | Shaft hole d, pilot hole diameter (mm) | Total width (mm) | Number of grooves | Groove Width (mm) | Maximum Number of Rotation (1/min) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
39.17 € | 1 | 7 Days | 10 | 7 | 177.8 | 168.8 | 30 | 12 | 30 | 1 | 12.30 | 1800 |
Loading...
Material | EN-JL 1030 Equiv. | V-belt thickness(mm) | 9 |
---|
This page is NS Standard V-Pulley A, part number NS7XA1.
You can find the detail information about specifications and dimensions on part number NS7XA1.
Configure
Basic Attributes
Type
Nominal
Outer Diameter(mm)
dm(mm)
Shaft hole d maximum diameter(mm)
Shaft hole d, pilot hole diameter(mm)
Total width(mm)
Number of grooves
Groove Width(mm)
Maximum Number of Rotation(1/min)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
NS11XA1 |
NS11XA2 |
NS11XA3 |
NS7XA2 |
NS7XA3 |
NS7XA4 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Nominal | Outer Diameter (mm) | dm (mm) | Shaft hole d maximum diameter (mm) | Shaft hole d, pilot hole diameter (mm) | Total width (mm) | Number of grooves | Groove Width (mm) | Maximum Number of Rotation (1/min) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
75.91 € | 1 | 8 Days | 10 | 11 | 279.4 | 270.4 | 35 | 12 | 35 | 1 | 12.30 | 1800 | ||
97.84 € | 1 | 8 Days | 10 | 11 | 279.4 | 270.4 | 40 | 12 | 36 | 2 | 12.30 | 1800 | ||
97.84 € | 1 | 8 Days | 10 | 11 | 279.4 | 270.4 | 42 | 15 | 52 | 3 | 12.30 | 1800 | ||
57.92 € | 1 | 5 Days | 10 | 7 | 177.8 | 168.8 | 35 | 12 | 45 | 2 | 12.30 | 1800 | ||
75.16 € | 1 | 8 Days | 10 | 7 | 177.8 | 168.8 | 35 | 15 | 52 | 3 | 12.30 | 1800 | ||
102.26 € | 1 | 9 Days | 10 | 7 | 177.8 | 168.8 | 42 | 18 | 68 | 4 | 12.30 | 1800 |