Manufacturer part number: VABP-S1-2V1G-G38-2
Brand: FESTO
Price: 369.54 €
Delivery time: 13 Days
Pneumatic connection 2: G3/8
Pneumatic connection 4: G3/8
Width: 54 mm
Standard nominal flow rate: 2000 l/min
Manufacturer part #: 2738671
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
VABP-S1-2V1G-G38-2
Part Number
|
---|
VABP-S1-2V1G-G38-2 |
Part Number | Related to |
Standard Unit Price
| Minimum order quantity | Volume Discount | Pneumatic connection 2 | Pneumatic connection 4 | Width (mm) | Standard nominal flow rate (l/min) | Manufacturer part # | Weight (g) | |
---|---|---|---|---|---|---|---|---|---|---|---|
369.54 € | 1 | 13 Days | G3/8 | G3/8 | 54 | 2000 | 2738671 | 1950 |
Loading...
Type | Sub-base | Material of screws | Steel | Min. Operating pressure(bar) | 0 |
---|---|---|---|---|---|
Min. Temperature of medium(°C) | 0 | Max. Operating pressure(bar) | 16 | Max. Temperature of medium(°C) | 50 |
Min. Ambient temperature(°C) | 0 | Max. Ambient temperature(°C) | 50 | Corrosion resistance class (CRC) | 0 - No corrosion stress |
This page is Sub-base, VABP Series, part number VABP-S1-2V1G-G38-2.
You can find the detail information about specifications and dimensions on part number VABP-S1-2V1G-G38-2.
Configure
Basic Attributes
Pneumatic connection 2
Pneumatic connection 4
Width(mm)
Standard nominal flow rate(l/min)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
VABP-S1-1V1G-G14-2 |
VABP-S1-1V1G-G14-2M-R3 |
VABP-S1-2V1G-G38-2M-A1 |
VABP-S3-26V1G-G18-2 |
VABP-S3-26V1G-G18-2M-R3 |
Part Number | Related To | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Pneumatic connection 2 | Pneumatic connection 4 | Width (mm) | Standard nominal flow rate (l/min) | Manufacturer part # | Weight (g) |
---|---|---|---|---|---|---|---|---|---|---|---|
326.20 € | 1 | 4 Days | G1/4 | G1/4 | 42 | 1400 | 2614860 | 1623 | |||
771.23 € | 1 | 8 Days | G1/4 | G1/4 | 42 | 1400 | 2614863 | 2480 | |||
984.65 € | 1 | 19 Days | G3/8 | G3/8 | 54 | 2000 | 2738672 | 3400 | |||
253.74 € | 1 | 4 Days | G1/8 | G1/8 | 26 | 800 | 2605074 | 668 | |||
674.57 € | 1 | 10 Days | G1/8 | G1/8 | 26 | 800 | 2605075 | 1200 |