Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Available dimensions and tolerances can be found under the tab More information.
Nut Type | Type | Screw Shaft | Nut | ||||
Material | Hardness | Surface Treatment | Material | Hardness | Surface Treatment | ||
Standard Nut | FBSSR | EN 1.1203 Equiv. | Induction Hardened 56 ~ 62HRC | Phosphate Conversion Coating | EN 1.7264 Equiv. | Carburized 58~62HRC | Low Temperature Black Chrome (Screw Shafts 8 and 10 are applied with Phosphate Conversion Coating) |
FBSSZ | - |
Further specifications can be found under the tab More information.
Part Number | - | L | - | F | - | P | - | S | - | V | - | U | - | C | - | KC | - | E | - | SC | - | X | - | Z | - | G | - | Q | - | K | - | N | - | J | - | JC | - | H | - | Y | - | W | - | R | |
FBSSRAA1004 FBSSZDJ2010 | - - | 450 1200 | - | F36 | - | P12 | - | S60 | - | V15 | - | U15 | - | G20 | - | Q15 | - | N10 |
- Material: steel
- Coatings: uncoated, LTBC coating, phosphate conversion coating
- Heat treatment: up to 62HRC
- Precision category: C3, C5, C7, C10
- Precision classes: precision class, standard class
- Slope: 1 to 32 mm
- Outer diameter: 6 to 32 mm
- Length (mm): 100 to 2000
- Nut shape: round flange, square flange, compact flange, block shape
Ball screws are intended for converting rotary motion to linear motion. This can also be done in reverse order from linear to rotary motion. With the ball screws, this is achieved extremely precisely due to their low play. In mechanical engineering, the ball thread drive is an indispensable feature and is indispensable in precision applications. These work in horizontal and vertical orientation, allowing to shift, raise and lower devices.
The ball screws are often driven by motors and shaft couplings, or manually via rotary/crank handles.
When utilising a keyway, it is recommended using a machine key, as these can be combined excellently due to the manufacturing tolerances.
For a smooth process, it is recommended installing the ball screw with a fixed bearing and a floating bearing. This ensures that the ball screw does not bend due to compression and generate vibrations. For this purpose, MISUMI offers the right support units drives in various designs. For more information on how to install ball screws, see the Installation Instructions available as a PDF.
Ball screw nuts are available in different shapes. These enable versatile utilisation, even in confined spaces. Due to their high precision, the ball screws can also provide a high level of repeatability that is necessary in precise positioning applications. These can be utilised, for example, for measuring devices or in 3D printing. It is recommended to use a pre-stressed ball screw for highly precise applications. Due to the pre-tensioning, the axial play is almost zero unlike a conventional ball screw. In addition, MISUMI offers single axis actuators (locating units) for such applications, which as drives are already equipped with precise ball screws.
In smaller applications, a slide screw or a so-called miniature screw drive can be used. Due to their design, these are very compact, but suitable for lower axial loads.
If very high forces occur, a lead screw could also be considered.
Which ball screw is the right one for your application must be calculated based on the existing factors and influences. You can use the selection Ball Screws that is available as a PDF for this purpose. You can also find the service life calculation in this link.
Application example for positioning stages
(1) Linear guide accessories, (2) Standard linear guide, (3) Table plate (meviy), (4) Ball screw, (5) Support units
Application example for the ball screw
(1)) Support units, (2) Ball screw nut stops, (3) Ball screw, (4) Ball screw nut mountings
Application example for a lifting device
(1) Ball screw, (2) Standard linear guide, (3) Support units, (4) Table top (meviy)
(1) Ball screw, (2) Standard linear guide, (3) Support units, (4) Table top (meviy)
3D preview is not available, because the part number has not yet been determined.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Screw Shaft O.D. (mm) | Lead (mm) | Axial Play | Number of Circuits (Rows x Windings) | Shaft Overall Length L (mm) | Basic Load Rating Dynamic Rating (N) | Basic Load Rating Static Rating (N) | Shaft End Shape on Support Side | Fixed Side Shaft End Shape | Shaft End Length F (mm) | Screw Shaft Surface Treatment | C (mm) | E (mm) | G (mm) | H (mm) | J (mm) | JC (mm) | K (mm) | KC (mm) | N (mm) | Q (mm) | R (mm) | S (mm) | SC (mm) | Shaft Dia. P (φ) | U (mm) | V (mm) | W (mm) | X (mm) | Y (mm) | Z (mm) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 1 | 9 Days | 10 | 8 | 2 | 0.05 or Less | 1 x 3.5 | 100 ~ 400 | 1800 | 3200 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 8 | 4 | 0.05 or Less | 1 x 2.5 | 100 ~ 380 | 1900 | 3100 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 585 | 1700 | 3000 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 585 | 1850 | 3200 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 28 | 6 | [0.10 or Less] 0.10 or Less | 2 x 2.5 | 200 ~ 2000 | 12100 | 42300 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 32 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 32800 | 86700 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 32 | 32 | [0.2 or Less] 0.15 or Less | 2 x 1.5 | 300 ~ 2000 | 14600 | 38900 | A (No Shaft End machining) | A (No Shaft End machining) | - | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
- | 1 | 9 Days | 10 | 8 | 2 | 0.05 or Less | 1 x 3.5 | 100 ~ 400 | 1800 | 3200 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 12 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 24 | - | 4 | 6 ~ 12 | 6 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 8 | 4 | 0.05 or Less | 1 x 2.5 | 100 ~ 380 | 1900 | 3100 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 12 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 24 | - | 4 | 6 ~ 12 | 6 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 585 | 1700 | 3000 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 18 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 13 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 585 | 1850 | 3200 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 13 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 24 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 24 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 24 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 30 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 30 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 30 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 39 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 39 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 39 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 54 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 54 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 54 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 28 | 6 | [0.10 or Less] 0.10 or Less | 2 x 2.5 | 200 ~ 2000 | 12100 | 42300 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 54 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 32 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 32800 | 86700 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 69 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 32 | 32 | [0.2 or Less] 0.15 or Less | 2 x 1.5 | 300 ~ 2000 | 14600 | 38900 | A (No Shaft End machining) | J (Double Stepped End machining) | 5 ~ 69 | Phosphate Coating | - | - | - | - | - | - | - | - | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 585 | 1700 | 3000 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 13 | Phosphate Coating | 2 ~ 11 | - | - | - | - | - | - | 0 ~ 11 | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 13 | Phosphate Coating | 2 ~ 11 | - | - | - | - | - | - | 0 ~ 11 | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 585 | 1850 | 3200 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 13 | Phosphate Coating | 2 ~ 11 | - | - | - | - | - | - | 0 ~ 11 | - | - | - | 5 ~ 32 | - | 4 ~ 6 | 8 ~ 16 | 8 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 24 | Phosphate Coating | 2 ~ 22 | - | - | - | - | - | - | 0 ~ 22 | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 24 | Phosphate Coating | 2 ~ 22 | - | - | - | - | - | - | 0 ~ 22 | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 14 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 800 | 4400 | 7300 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 24 | Phosphate Coating | 2 ~ 22 | - | - | - | - | - | - | 0 ~ 22 | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 150 ~ 1200 | 5100 | 10500 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 30 | Phosphate Coating | 2 ~ 28 | - | - | - | - | - | - | 0 ~ 28 | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 10 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 1200 | 5100 | 10500 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 30 | Phosphate Coating | 2 ~ 28 | - | - | - | - | - | - | 0 ~ 28 | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 15 | 20 | [0.10 or Less] 0.10 or Less | 2 x 1.5 | 200 ~ 1200 | 5800 | 13300 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 30 | Phosphate Coating | 2 ~ 28 | - | - | - | - | - | - | 0 ~ 28 | - | - | - | 5 ~ 48 | - | 4 ~ 10 | 10 ~ 24 | 10 ~ 12 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6200 | 14700 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 39 | Phosphate Coating | 2 ~ 37 | - | - | - | - | - | - | 0 ~ 37 | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 10 | [0.2 or Less] 0.15 or Less | 1 x 2.5 | 250 ~ 2000 | 10600 | 22700 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 39 | Phosphate Coating | 2 ~ 37 | - | - | - | - | - | - | 0 ~ 37 | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 20 | 20 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 250 ~ 2000 | 6200 | 14700 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 39 | Phosphate Coating | 2 ~ 37 | - | - | - | - | - | - | 0 ~ 37 | - | - | - | 5 ~ 60 | - | 4 ~ 13 | 10 ~ 30 | 10 ~ 15 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 5 | [0.10 or Less] 0.10 or Less | 1 x 2.5 | 200 ~ 2000 | 6600 | 18700 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 54 | Phosphate Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 27500 | 76300 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 54 | Phosphate Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 25 | 25 | [0.2 or Less] 0.12 or Less | 1 x 2.5 | 300 ~ 2000 | 9300 | 22700 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 54 | Phosphate Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 28 | 6 | [0.10 or Less] 0.10 or Less | 2 x 2.5 | 200 ~ 2000 | 12100 | 42300 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 54 | Phosphate Coating | 2 ~ 52 | - | - | - | - | - | - | 0 ~ 52 | - | - | - | 5 ~ 80 | - | 4 ~ 18 | 15 ~ 40 | 15 ~ 20 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 32 | 10 | [0.2 or Less] 0.20 or Less | 2 x 2.5 | 300 ~ 2000 | 32800 | 86700 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 69 | Phosphate Coating | 2 ~ 67 | - | - | - | - | - | - | 0 ~ 67 | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 32 | 32 | [0.2 or Less] 0.15 or Less | 2 x 1.5 | 300 ~ 2000 | 14600 | 38900 | A (No Shaft End machining) | K (Double Stepped, Keyway machining) | 5 ~ 69 | Phosphate Coating | 2 ~ 67 | - | - | - | - | - | - | 0 ~ 67 | - | - | - | 5 ~ 100 | - | 4 ~ 23 | 20 ~ 50 | 20 ~ 25 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 800 | 2600 | 5800 | A (No Shaft End machining) | m (Double Stepped, Tapped Hole on the End) | 5 ~ 24 | Phosphate Coating | - | 4 ~ 6 | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - | ||
- | 1 | 9 Days | 10 | 12 | 10 | [0.10 or Less] 0.10 or Less | 1 x 1.5 | 150 ~ 800 | 2850 | 4950 | A (No Shaft End machining) | m (Double Stepped, Tapped Hole on the End) | 5 ~ 24 | Phosphate Coating | - | 4 ~ 6 | - | - | - | - | - | - | - | - | - | 5 ~ 40 | - | 4 ~ 8 | 8 ~ 20 | 8 ~ 10 | - | - | - | - |
Loading...
V | Tolerance |
6 | -0.002 -0.007 |
8 | -0.002 -0.008 |
10 | -0.002 -0.015 |
12, 15 | -0.003 -0.018 |
20, 25 | -0.004 -0.021 |
Accuracy Grade | Part Number | 1mm Increment | 1mm Increment | Selection | 1mm Increment | Selection | ||||||||||||||||||||||||||||||
Type | Left End Support Side | Right End Fixed Side | Screw Shaft O.D. | Lead | L | F | P | S | U | C | KC | SC | X | Z | V | E (Coarse) | G | K | J | JC | H | Y | R | W | Q | N (Coarse) | ||||||||||
C10 | FBSSR FBSSZ | A B C D E F G H | A J K M N P R S | 08 | 02 | 100~400 | 5≤F≤Px3 9≤S≤Vx4 V≤U≤Vx2 U≤S-Pitch x3 b1<C≤60 F-C-KC≥2 KC=0 or KC≥2 5≤SC≤Px3 SC≤F-2 5≤X≤20 P≥4 P≥V/2 When V=6, P=4 When V≥8, P≤V-2 | 6 | 4 5 6 8 10 | 5≤G≤Qx3 5≤K≤Qx3 3≤J≤20 H≥Q-2 5≤Y≤20 R≤Q-2 | 6 | - | ||||||||||||||||||||||||
08 | 04 | 100~380 | 6 | |||||||||||||||||||||||||||||||||
10 | 02 | 150~585 | 8 | 6 | - | |||||||||||||||||||||||||||||||
10 | 04 | 150~600 | 6 | |||||||||||||||||||||||||||||||||
10 | 10 | 150~585 | 6 | |||||||||||||||||||||||||||||||||
12 | 04 | 150~800 | 8 | 10 | 6 | 8 | 4 | |||||||||||||||||||||||||||||
12 | 10 | 150~800 | 8 | 10 | ||||||||||||||||||||||||||||||||
14 | 05 | 150~800 | 8 | 10 | 6 | 8 | 10 | 4 | 5 | 6 | ||||||||||||||||||||||||||
15 | 05 | 150~1200 | 10 | 12 | 8 | 10 | 12 | 5 | 6 | 8 | ||||||||||||||||||||||||||
15 | 10 | 200~1200 | ||||||||||||||||||||||||||||||||||
15 | 20 | |||||||||||||||||||||||||||||||||||
20 | 05 | 200~2000 | 10 | 12 | 15 | 8 | 10 | 12 | 15 | 5 | 6 | 8 | 10 | |||||||||||||||||||||||
20 | 10 | 250~2000 | ||||||||||||||||||||||||||||||||||
20 | 20 | |||||||||||||||||||||||||||||||||||
25 | 05 | 200~2000 | 15 | 20 | 10 | 12 | 15 | 20 | 6 | 8 | 10 | |||||||||||||||||||||||||
25 | 10 | 300~2000 | ||||||||||||||||||||||||||||||||||
25 | 25 | |||||||||||||||||||||||||||||||||||
28 | 06 | 200~2000 | 15 | 20 | 10 | 12 | 15 | 20 | 6 | 8 | 10 | |||||||||||||||||||||||||
32 | 10 | 300~2000 | 20 | 25 | 10 | 12 | 15 | 20 | 25 | 6 | 8 | 10 | ||||||||||||||||||||||||
32 | 32 | |||||||||||||||||||||||||||||||||||
For FBSSZ type, sizes 0804, 1002 and 1010 are not available. E≤P-4 N≤Q-4 |
Type | Rolled | Nut Type | Standard Nuts | Accuracy Grade | C10 |
---|---|---|---|---|---|
Preload | Not Preloaded | Conditions of Use | Standard | Twisting Direction | Right |
Nut structure | 1-fach | Circuit System | Tube Type | Grease Type | Standard |
Nut Size | Standard |
Configure
Basic Attributes
Screw Shaft O.D.(mm)
Lead(mm)
Axial Play
Number of Circuits(Rows x Windings)
Shaft Overall Length L(mm)
Shaft End Shape on Support Side
Fixed Side Shaft End Shape
Shaft End Length F(mm)
Screw Shaft Surface Treatment
C(mm)
E(mm)
G(mm)
H(mm)
J(mm)
JC(mm)
K(mm)
KC(mm)
N(mm)
Q(mm)
R(mm)
S(mm)
SC(mm)
Shaft Dia. P(φ)
U(mm)
V(mm)
W(mm)
X(mm)
Y(mm)
Z(mm)
Type