Manufacturer part number: CSPPN2-STH-M2.6-10
Brand: SUNCO
Price: 142.86 €
Delivery time: 15 Days
Screw Nominal (M): 2.6
Length L (mm): 10
Surface Treatment: [Chrome Plating] Chrome Plated
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
CSPPN2-STH-M2.6-10
Part Number
|
---|
CSPPN2-STH-M2.6-10 |
Part Number |
Standard Unit Price
| Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | RoHS | Screw Nominal (M) | Length L (mm) | Surface Treatment | |
---|---|---|---|---|---|---|---|---|---|
142.86 € | 5,000 Pieces Per Package | 1 pack | 15 Days | 10 | 2.6 | 10 | [Chrome Plating] Chrome Plated |
Loading...
Detailed Shape | Pan | Mounting Hole Shape | Phillips Head | Thread Type | Metric Coarse |
---|---|---|---|---|---|
Basic Shape | Standard (Round) | Sales Unit | Box/Package | Application | Standard |
This page is No. 0 Type 2 Phillips Pan Head Screw, part number CSPPN2-STH-M2.6-10.
You can find the detail information about specifications and dimensions on part number CSPPN2-STH-M2.6-10.
Configure
Basic Attributes
Type
Screw Nominal (M)
Length L (mm)
Surface Treatment
Filter by CAD data type
Filter by standard shipping days
Optional Attributes
Part Number |
---|
CSPPN2-ST3B-M1.4-3 |
CSPPN2-ST3B-M1.4-3.5 |
CSPPN2-ST3B-M1.4-4 |
CSPPN2-STH-M2.6-2.5 |
CSPPN2-STH-M2.6-3 |
CSPPN2-STH-M2.6-3.5 |
Part Number | Standard Unit Price | Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Screw Nominal (M) | Length L (mm) | Surface Treatment |
---|---|---|---|---|---|---|---|---|---|
86.33 € | 5,000 Pieces Per Package | 1 pack | 6 Days | 10 | 1.4 | 3 | [Trivalent Chromate] Trivalent Black | ||
141.97 € | 10,000 Pieces Per Package | 1 pack | 15 Days | 10 | 1.4 | 3.5 | [Trivalent Chromate] Trivalent Black | ||
141.97 € | 10,000 Pieces Per Package | 1 pack | 6 Days | 10 | 1.4 | 4 | [Trivalent Chromate] Trivalent Black | ||
143.33 € | 5,000 Pieces Per Package | 1 pack | 15 Days | 10 | 2.6 | 2.5 | [Chrome Plating] Chrome Plated | ||
143.19 € | 5,000 Pieces Per Package | 1 pack | 15 Days | 10 | 2.6 | 3 | [Chrome Plating] Chrome Plated | ||
143.19 € | 5,000 Pieces Per Package | 1 pack | 15 Days | 10 | 2.6 | 3.5 | [Chrome Plating] Chrome Plated |