Manufacturer part number: F-100N
Brand: SHO-BOND COUPLING
Price: 127.00 €
Delivery time: 8 Days
Applicable Fluids: Water / Air / Organic Gas / Oils and Fats
Nominal Diameter: 100A
Maximum Pressure Gas used [There are limites in the usage condition]: 1.6 MPa
Rubber Sleeve Material: NBR
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
F-100N
Part Number
|
---|
F-100N |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Applicable Fluids | Nominal Diameter | Maximum Pressure Gas used [There are limites in the usage condition] (MPa) | Rubber Sleeve Material | |
---|---|---|---|---|---|---|---|---|
127.00 € | 1 | 8 Days | Water / Air / Organic Gas / Oils and Fats | 100A | 1.6 | NBR |
Loading...
Type | Joint | Applicable Pipe | Steel Pipe / Stainless Steel Pipe / Other resin pipes | Casing Material | Stainless Steel (EN 1.4301 Equiv.) |
---|---|---|---|---|---|
Tightening Bolt Type | Hexagon Socket Head Bolt |
This page is Straub / Flex, F Type, part number F-100N.
You can find the detail information about specifications and dimensions on part number F-100N.
Configure
Basic Attributes
Applicable Fluids
Type
Nominal Diameter
Maximum Pressure Gas used [There are limites in the usage condition](MPa)
Rubber Sleeve Material
Filter by standard shipping days
Optional Attributes
Part Number |
---|
F-100E |
F-125E |
F-125N |
F-150E |
F-150N |
F-175E |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Applicable Fluids | Nominal Diameter | Maximum Pressure Gas used [There are limites in the usage condition] (MPa) | Rubber Sleeve Material |
---|---|---|---|---|---|---|---|---|
127.00 € | 1 | 8 Days | Water / Air / Chemical | 100A | 1.6 | EPDM | ||
123.60 € | 1 | 8 Days | Water / Air / Chemical | 125A | 1.6 | EPDM | ||
123.60 € | 1 | 8 Days | Water / Air / Organic Gas / Oils and Fats | 125A | 1.6 | NBR | ||
140.29 € | 1 | 8 Days | Water / Air / Chemical | 150A | 1.6 | EPDM | ||
140.29 € | 1 | 8 Days | Water / Air / Organic Gas / Oils and Fats | 150A | 1.6 | NBR | ||
210.81 € | 1 | 8 Days | Water / Air / Chemical | 175A | 1.6 | EPDM |