Tap-Tight, B Type, No. 0, Type 2, Pan-Head【5,000-10,000 Pieces Per Package】 (CSPPNH02B-STN-M2-5)

Tap-Tight, B Type, No. 0, Type 2, Pan-Head CSPPNH02B-STN-M2-5

Product Details:

Manufacturer part number: CSPPNH02B-STN-M2-5

Brand: SUNCO

Price: 90.63

Delivery time: 6 Days


Technical Data:

Screw Nominal (M): 2

Length L (mm): 5

Surface Treatment: [Nickel Plating] Nickel Plating


Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

CSPPNH02B-STN-M2-5

Part Number
CSPPNH02B-STN-M2-5
Part Number
Standard Unit Price
Number of pc(s). included in pkg.Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSScrew Nominal (M) Length L (mm) Surface Treatment

90.63 €

5,000 Pieces Per Package

1 pack 6 Days 1025[Nickel Plating] Nickel Plating

Loading...

  1. 1

Basic information

Detailed Shape Pan Material Steel Mounting Hole Shape Phillips Head
Tip Shape Flat End Thread Type Tap-Tight Basic Shape Standard (Round)
Sales Unit Box/Package

This page is Tap-Tight, B Type, No. 0, Type 2, Pan-Head, part number CSPPNH02B-STN-M2-5.
You can find the detail information about specifications and dimensions on part number CSPPNH02B-STN-M2-5.

Variation of this product

Part Number
CSPPNH02B-ST3B-M1.4-5
CSPPNH02B-ST3B-M1.4-6
CSPPNH02B-ST3B-M1.6-3
CSPPNH02B-ST3B-M1.6-4
CSPPNH02B-ST3B-M1.6-4.5
CSPPNH02B-STN-M2-6
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountStandard
Shipping Days
?
RoHSScrew Nominal (M) Length L (mm) Surface Treatment

175.30 €

10,000 Pieces Per Package

1 pack 6 Days 101.45[Trivalent Chromate] Trivalent Black

90.48 €

5,000 Pieces Per Package

1 pack 6 Days 101.46[Trivalent Chromate] Trivalent Black

168.96 €

10,000 Pieces Per Package

1 pack 6 Days 101.63[Trivalent Chromate] Trivalent Black

153.02 €

10,000 Pieces Per Package

1 pack 6 Days 101.64[Trivalent Chromate] Trivalent Black

168.96 €

10,000 Pieces Per Package

1 pack 6 Days 101.64.5[Trivalent Chromate] Trivalent Black

60.89 €

5,000 Pieces Per Package

1 pack 6 Days 1026[Nickel Plating] Nickel Plating

Tech Support