Manufacturer part number: SSHC-STC-M20-30
Brand: SUNCO
Price: 4.75 €
Delivery time: 6 Days
Screw Nominal (M): 20
Length L: 30 mm
Surface Treatment: [Chromate Plating] Chromate Plating
Sales Unit: Low Quantity (can be purchased from one)
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
SSHC-STC-M20-30
Part Number
|
---|
SSHC-STC-M20-30 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Screw Nominal (M) | Length L (mm) | Surface Treatment | Sales Unit | |
---|---|---|---|---|---|---|---|---|---|
4.75 € | 1 | Available | 6 Days | - | 20 | 30 | [Chromate Plating] Chromate Plating | Low Quantity (can be purchased from one) |
Loading...
Material | Steel | Mounting Hole Shape | Hex Socket | Tip Shape | Cup Point |
---|---|---|---|---|---|
Additional Shape | Standard | Thread Type | Not specified | Basic Shape | Set Screw |
Application | Standard |
This page is Hexagon Socket Set Screw, Indented Tip, by Tokosha Metal Works Co., Ltd., part number SSHC-STC-M20-30.
You can find the detail information about specifications and dimensions on part number SSHC-STC-M20-30.
Configure
Basic Attributes
Type
Screw Nominal (M)
Length L(mm)
Surface Treatment
Sales Unit
Filter by standard shipping days
Optional Attributes
Part Number |
---|
SSHC-ST-M10-80 |
SSHC-ST-M12-65 |
SSHC-ST-M12-70 |
SSHC-STC-M20-35 |
SSHC-STC-M20-40 |
SSHC-STC-M20-45 |
Part Number | Standard Unit Price | Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Screw Nominal (M) | Length L (mm) | Surface Treatment | Sales Unit |
---|---|---|---|---|---|---|---|---|---|---|
3.35 € | 1 | Available | 6 Days | 10 | 10 | 80 | [Not Provided] N/A | Low Quantity (can be purchased from one) | ||
2.97 € | 1 | Available | 6 Days | 10 | 12 | 65 | [Not Provided] N/A | Low Quantity (can be purchased from one) | ||
3.81 € | 1 | Available | 6 Days | 10 | 12 | 70 | [Not Provided] N/A | Low Quantity (can be purchased from one) | ||
100.07 € | 50 Pieces Per Package | 1 pack | 15 Days | - | 20 | 35 | [Chromate Plating] Chromate Plating | Box/Package | ||
111.95 € | 50 Pieces Per Package | 1 pack | 15 Days | - | 20 | 40 | [Chromate Plating] Chromate Plating | Box/Package | ||
100.05 € | 40 Pieces Per Package | 1 pack | Available | 15 Days | - | 20 | 45 | [Chromate Plating] Chromate Plating | Box/Package |