Manufacturer part number: BN-8
Brand: SHINOHARA ELECTRIC
Price: 103.36 €
Delivery time: 8 Days
Width: 40 mm
Length: 32 mm
Thickness: 2.3 mm
Screw specifications: M8
Compatible Model: For A-40/A-50/C-44 assembly
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
BN-8
Part Number
|
---|
BN-8 |
Part Number |
Standard Unit Price
| Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | RoHS | Width (mm) | Length (mm) | Thickness (mm) | Screw specifications | Compatible Model | Number with packs (Piece) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
103.36 € | 100 Pieces Per Package | 1 pack | 8 Days | 10 | 40 | 32 | 2.3 | M8 | For A-40/A-50/C-44 assembly | 100 |
Loading...
Type | Channel / Rail Part | Material/surface treatment | Steel made, trivalent chromate |
---|
This page is ABC Parts (Square Nut), part number BN-8.
You can find the detail information about specifications and dimensions on part number BN-8.
Configure
Basic Attributes
Type
Width(mm)
Length(mm)
Thickness(mm)
Screw specifications
Compatible Model
Filter by standard shipping days
Optional Attributes
Part Number |
---|
BN-10 |
BN-5 |
BN-6 |
F-3 |
F-4 |
F-5 |
Part Number | Standard Unit Price | Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Width (mm) | Length (mm) | Thickness (mm) | Screw specifications | Compatible Model | Number with packs (Piece) |
---|---|---|---|---|---|---|---|---|---|---|---|---|
107.36 € | 100 Pieces Per Package | 1 pack | 8 Days | 10 | 40 | 32 | 2.3 | M10 | For A-40/A-50/C-44 assembly | 100 | ||
122.44 € | 100 Pieces Per Package | 1 pack | 8 Days | 10 | 40 | 32 | 1.6 | M5 | For A-40/A-50/C-44 assembly | 100 | ||
122.44 € | 100 Pieces Per Package | 1 pack | 8 Days | 10 | 40 | 32 | 1.6 | M6 | For A-40/A-50/C-44 assembly | 100 | ||
109.71 € | 500 Pieces Per Package | 1 pack | 5 Days | 10 | 15 | 15 | 1.6 | M3 | For C-19 assembly | 500 | ||
109.71 € | 500 Pieces Per Package | 1 pack | 5 Days | 10 | 15 | 15 | 1.6 | M4 | For C-19 assembly | 500 | ||
109.71 € | 500 Pieces Per Package | 1 pack | 5 Days | 10 | 15 | 15 | 1.6 | M5 | For C-19 assembly | 500 |