Manufacturer part number: VFF7020-6202
Brand: NABEYA BI-TECH
Price: 15.22 €
Delivery time: 6 Days
Outer Diameter: 70 Ø
Nominal Width: 20 mm
Length L: Up to 50 mm
Shaft Type: Bearing 1 pc.
Shaft (Bore) Dia. d: 15 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
VFF7020-6202
Part Number
|
---|
VFF7020-6202 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Outer Diameter (Ø) | Nominal Width (mm) | Length L (mm) | Shaft Type | Shaft (Bore) Dia. d (mm) | |
---|---|---|---|---|---|---|---|---|---|---|
15.22 € | 1 | Available | 6 Days | 10 | 70 | 20 | Up to 50 | Bearing 1 pc. | 15 |
Loading...
Type | Idler (Bearing Built-In) | With or w/o Flange | Flanged | Shape | Straight |
---|---|---|---|---|---|
Surface Urethane | No Urethane | Material | Nylon 66 | Surface Treatment | NA |
Shaft End Spec. | NA | Flange Shape | Standard |
This page is VFF Engineering Plastic Flanged Idler, part number VFF7020-6202.
You can find the detail information about specifications and dimensions on part number VFF7020-6202.
Configure
Basic Attributes
Type
Outer Diameter(Ø)
Nominal Width(mm)
Length L(mm)
Shaft Type
Shaft (Bore) Dia. d(mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
VFF4520-6202 |
VFF5025-6201 |
VFF5045-6202W |
VFF7030-6202 |
VFF7050-6202W |
VFF7050-6203W |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Outer Diameter (Ø) | Nominal Width (mm) | Length L (mm) | Shaft Type | Shaft (Bore) Dia. d (mm) |
---|---|---|---|---|---|---|---|---|---|---|
13.48 € | 1 | Available | 6 Days | 10 | 45 | 20 | Up to 50 | Bearing 1 pc. | 15 | |
14.22 € | 1 | 9 Days | 10 | 50 | 25 | Up to 50 | Bearing 1 pc. | 12 | ||
25.01 € | 1 | 6 Days | 10 | 50 | 45 | Up to 100 | Bearing center 2 pcs. | 15 | ||
16.36 € | 1 | 9 Days | 10 | 70 | 30 | Up to 50 | Bearing 1 pc. | 15 | ||
26.56 € | 1 | 9 Days | 10 | 70 | 50 | Up to 100 | Bearing center 2 pcs. | 15 | ||
30.53 € | 1 | 9 Days | 10 | 70 | 50 | Up to 100 | Bearing center 2 pcs. | 17 |