Manufacturer part number: K2019.430610
Brand: KIPP
Price: 554.16 €
Delivery time: 4 Days
B=Width: 43 mm
H=Height: 44 mm
L=Length: 610 mm
Travel S: 626 mm
C0Y: 1082 N
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
K2019.430610
Part Number
|
---|
K2019.430610 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | B=Width (mm) | H=Height (mm) | L=Length (mm) | Travel S (mm) | C0Y (N) | C0Z (N) | D for screws | Size | Number of holes | R (mm) | Weight (kg) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
554.16 € | 1 | 4 Days | 43 | 44 | 610 | 626 | 1082 | 1082 | M8 | 43 | 8 | 2.5 | 6.5100 |
Loading...
Main material | ball-bearing steel | Item | Telescopic Rail | RoHS | true |
---|
This page is Telescopic slides, Steel double arrangement, full extension, load capacity up to 133 kg (K2019), part number K2019.430610.
You can find the detail information about specifications and dimensions on part number K2019.430610.
Configure
Basic Attributes
Type
B=Width(mm)
H=Height(mm)
L=Length(mm)
Travel S(mm)
C0Y(N)
C0Z(N)
D for screws
Size
Number of holes
R(mm)
Weight(kg)
Filter by CAD data type
Filter by standard shipping days
Optional Attributes
Part Number |
---|
K2019.280450 |
K2019.280530 |
K2019.350370 |
K2019.350450 |
K2019.430770 |
K2019.430930 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | B=Width (mm) | H=Height (mm) | L=Length (mm) | Travel S (mm) | C0Y (N) | C0Z (N) | D for screws | Size | Number of holes | R (mm) | Weight (kg) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
306.52 € | 1 | 4 Days | 28 | 26 | 450 | 464 | 393 | 393 | M5 | 28 | 6 | 1 | 1.7300 | ||
342.08 € | 1 | 4 Days | 28 | 26 | 530 | 548 | 332 | 332 | M5 | 28 | 7 | 1 | 2.1800 | ||
311.28 € | 1 | 4 Days | 35 | 34 | 370 | 406 | 522 | 522 | M6 | 35 | 5 | 2 | 2.2600 | ||
362.96 € | 1 | 4 Days | 35 | 34 | 450 | 494 | 429 | 429 | M6 | 35 | 6 | 2 | 2.7500 | ||
665.13 € | 1 | 4 Days | 43 | 44 | 770 | 796 | 845 | 845 | M8 | 43 | 10 | 2.5 | 8.2200 | ||
731.27 € | 1 | 4 Days | 43 | 44 | 930 | 966 | 693 | 693 | M8 | 43 | 12 | 2.5 | 9.9100 |