Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Overall Length (m) | Conductor Cross Section (mm2) | Number Of Cores (Core) | Finished outer diameter (mm) | Rated Voltage | Grounding Wire | Minimum bending radius while running (mm) | Minimum bending radius when fixed (mm) | Conductor resistance (Ω/km) | Reference allowable current value (30°C) (A) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6.68 € | 1 | 5 Days | 10 | 1 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
13.35 € | 1 | 5 Days | 10 | 2 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
20.00 € | 1 | 5 Days | 10 | 3 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
26.68 € | 1 | 5 Days | 10 | 4 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
33.35 € | 1 | 5 Days | 10 | 5 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
40.03 € | 1 | 5 Days | 10 | 6 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
46.68 € | 1 | 5 Days | 10 | 7 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
53.35 € | 1 | 5 Days | 10 | 8 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
60.03 € | 1 | 5 Days | 10 | 9 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
66.71 € | 1 | 5 Days | 10 | 10 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
73.35 € | 1 | 5 Days | 10 | 11 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
80.03 € | 1 | 5 Days | 10 | 12 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
86.71 € | 1 | 5 Days | 10 | 13 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
93.38 € | 1 | 5 Days | 10 | 14 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
100.03 € | 1 | 5 Days | 10 | 15 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
106.71 € | 1 | 5 Days | 10 | 16 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
113.38 € | 1 | 5 Days | 10 | 17 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
120.06 € | 1 | 5 Days | 10 | 18 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
126.71 € | 1 | 5 Days | 10 | 19 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
133.38 € | 1 | 5 Days | 10 | 20 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
140.06 € | 1 | 5 Days | 10 | 21 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
146.74 € | 1 | 5 Days | 10 | 22 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
153.38 € | 1 | 5 Days | 10 | 23 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
160.06 € | 1 | 5 Days | 10 | 24 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
166.74 € | 1 | 5 Days | 10 | 25 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
173.42 € | 1 | 5 Days | 10 | 26 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
180.06 € | 1 | 5 Days | 10 | 27 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
186.74 € | 1 | 5 Days | 10 | 28 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
193.42 € | 1 | 5 Days | 10 | 29 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
200.09 € | 1 | 5 Days | 10 | 30 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
206.74 € | 1 | 5 Days | 10 | 31 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
213.42 € | 1 | 5 Days | 10 | 32 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
220.09 € | 1 | 5 Days | 10 | 33 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
226.77 € | 1 | 5 Days | 10 | 34 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
233.42 € | 1 | 5 Days | 10 | 35 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
240.09 € | 1 | 5 Days | 10 | 36 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
246.77 € | 1 | 5 Days | 10 | 37 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
253.45 € | 1 | 5 Days | 10 | 38 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
260.09 € | 1 | 5 Days | 10 | 39 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
266.77 € | 1 | 5 Days | 10 | 40 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
273.45 € | 1 | 5 Days | 10 | 41 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
280.12 € | 1 | 5 Days | 10 | 42 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
286.77 € | 1 | 5 Days | 10 | 43 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
293.45 € | 1 | 5 Days | 10 | 44 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
300.12 € | 1 | 5 Days | 10 | 45 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
306.80 € | 1 | 5 Days | 10 | 46 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
313.45 € | 1 | 5 Days | 10 | 47 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
320.12 € | 1 | 5 Days | 10 | 48 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
326.80 € | 1 | 5 Days | 10 | 49 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
333.48 € | 1 | 5 Days | 10 | 50 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
340.12 € | 1 | 5 Days | 10 | 51 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
346.80 € | 1 | 5 Days | 10 | 52 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
353.48 € | 1 | 5 Days | 10 | 53 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
360.15 € | 1 | 5 Days | 10 | 54 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
366.80 € | 1 | 5 Days | 10 | 55 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
373.48 € | 1 | 5 Days | 10 | 56 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
380.15 € | 1 | 5 Days | 10 | 57 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
386.83 € | 1 | 5 Days | 10 | 58 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
393.48 € | 1 | 5 Days | 10 | 59 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 | ||
400.15 € | 1 | 5 Days | 10 | 60 | 1 | 3 | 6 | [300V] 300/500V | GY (green/yellow) colored | 30 | 18 | 19.5 | 17 |
Loading...
Shield | N/A | Properties | Oil Resistance / Weatherproof | Representative Standard | CE |
---|---|---|---|---|---|
Sheath (outer coating) color | Dark blue | Sheath (outer coating) material | Low adhesiveness TPE admixture | Insulation body materials | TPE admixture |
Free span maximum running speed(m/s) | 10 | Slide maximum running speed(m/s) | 6 | Maximum acceleration(m/s2) | 100 |
Stroke | Up to 400m | Twist(° (1 m)) | ±90 | Other standards | Iso class 1(IPA): clean room capable |
Other cable properties | Silicone-free, halogen-free | Note 1 | Rated voltage: Uo/U (V) Uo = Voltage between conductor and ground, U = voltage between conductors |
Configure
Basic Attributes
Overall Length(m)
Conductor Cross Section(mm2)
Number Of Cores(Core)
Finished outer diameter(mm)
Rated Voltage
Grounding Wire
Minimum bending radius while running(mm)
Minimum bending radius when fixed(mm)
Conductor resistance(Ω/km)
Reference allowable current value (30°C)(A)
Filter by standard shipping days
Optional Attributes