Manufacturer part number: SP-LMR19-200-350-MT2
Brand: TAIYO-TOOL
Price: 558.28 €
Delivery time: 6 Days
External diameter φD: 19 mm
Blade Length: 200 mm
Handle No.: MT2
Overall Length: 350 mm
Handle length: 78.5 mm
Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
SP-LMR19-200-350-MT2
Part Number
|
---|
SP-LMR19-200-350-MT2 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | External diameter φD (mm) | Blade Length (mm) | Handle No. | Overall Length (mm) | Handle length (mm) | Number of flutes | Grip length (mm) | |
---|---|---|---|---|---|---|---|---|---|---|---|
558.28 € | 1 | 6 Days | 19 | 200 | MT2 | 350 | 78.5 | 8 | 1.5 |
Loading...
Shank Type | Morse Taper Shank | Coating Y/N | N/A | Groove Shape | Spiral |
---|---|---|---|---|---|
Base Blade Y/N | N/A |
This page is Spiral Blade Long Machine Reamer SP-LMR (SKH51), part number SP-LMR19-200-350-MT2.
You can find the detail information about specifications and dimensions on part number SP-LMR19-200-350-MT2.
Configure
Basic Attributes
Type
External diameter φD(mm)
Blade Length(mm)
Handle No.
Overall Length(mm)
Handle length(mm)
Number of flutes
Grip length(mm)
Filter by standard shipping days
Optional Attributes
Part Number |
---|
SP-LMR10-160-250-MT1 |
SP-LMR10-200-300-MT1 |
SP-LMR10-200-350-MT1 |
SP-LMR19-250-400-MT2 |
SP-LMR19.5-200-350-MT2 |
SP-LMR19.5-250-400-MT2 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | External diameter φD (mm) | Blade Length (mm) | Handle No. | Overall Length (mm) | Handle length (mm) | Number of flutes | Grip length (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
298.22 € | 1 | 6 Days | 10 | 160 | MT1 | 250 | 65.5 | 6 | 1 | ||
380.96 € | 1 | 6 Days | 10 | 200 | MT1 | 300 | 65.5 | 6 | 1 | ||
435.20 € | 1 | 6 Days | 10 | 200 | MT1 | 350 | 65.5 | 6 | 1 | ||
701.52 € | 1 | 6 Days | 19 | 250 | MT2 | 400 | 78.5 | 8 | 1.5 | ||
558.28 € | 1 | 6 Days | 19.5 | 200 | MT2 | 350 | 78.5 | 8 | 1.5 | ||
701.52 € | 1 | 6 Days | 19.5 | 250 | MT2 | 400 | 78.5 | 8 | 1.5 |