Shipping Days |
|
---|
?* Information on days to ship and prices
KITZ
Starting from∗ : | 694.26 € |
---|---|
Min. Shipping Days : | 7 Days |
*Unit price with basic configuration
Starting from∗ : | 379.71 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days : |
Type |
Applicable Fluid |
Nominal Pressure |
Body Material |
Supply Side, Connection Type |
Supply Side, Plumbing Thread Nominal |
Supply Side, Tube Flange Nominal |
Control Side, Connection Type |
Control Side, Plumbing Thread Nominal |
Control Side, Tube Flange Nominal |
Max. Operating Pressure(MPa) |
Cracking Pressure(MPa) |
Brand | KITZ | KITZ |
---|---|---|
Product Series | ||
Starting from∗ | 694.26 € *Unit price with basic configuration Volume Discount | 379.71 € *Unit price with basic configuration Volume Discount |
Min. Shipping Days : | 7 Days | 8 Days |
Type | Swing Type | Swing Type |
Applicable Fluid | Water / Air / Oil / Gas | Water |
Nominal Pressure | 10K | 125 |
Body Material | Bronze | Bronze |
Supply Side, Connection Type | Rc (R) | Rc (R) |
Supply Side, Plumbing Thread Nominal | 3B | 3B |
Supply Side, Tube Flange Nominal | - | - |
Control Side, Connection Type | Rc (R) | Rc (R) |
Control Side, Plumbing Thread Nominal | 3B | 3B |
Control Side, Tube Flange Nominal | - | - |
Max. Operating Pressure(MPa) | 1.4 | 1.18 |
Cracking Pressure(MPa) | - | - |
Loading...