Shipping Days |
|
---|
?* Information on days to ship and prices
YAMAWA MFG
Starting from∗ : | 343.09 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
YAMAWA MFG
Starting from∗ : | 49.86 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
YAMAWA MFG
Starting from∗ : | 61.39 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
YAMAWA MFG
Starting from∗ : | 402.32 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
YAMAWA MFG
Starting from∗ : | 140.97 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
YAMAWA MFG
Starting from∗ : | 402.32 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
YAMAWA MFG
Starting from∗ : | 343.09 € |
---|---|
Min. Shipping Days : | 8 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days : |
Screw Types |
Screw size (Nominal) |
Pitch (P), Number of Threading(mm) |
Chamfer threads (Lcf) |
Tool Material Type |
work material |
Tap Type |
Hole type |
Coating Y/N |
Coating Type |
Overall Length (L)(mm) |
Brand | YAMAWA MFG | YAMAWA MFG | YAMAWA MFG | YAMAWA MFG | YAMAWA MFG | YAMAWA MFG | YAMAWA MFG |
---|---|---|---|---|---|---|---|
Product Series | For Tapered Screw for Pipe (Short Screw Type Spiral) SP-S-PT | For Tapered Screw for Pipe (Short Screw Type for Use with Cast Iron Hard) CT-S-PT | For Tapered Screw for Pipe (Long Screw Type Long Shank) LS-PT | For Tapered Screw for Pipe (Long Screw Type for Use with Cast Iron Hard) CT-PT | |||
Starting from∗ | 343.09 € *Unit price with basic configuration | 49.86 € *Unit price with basic configuration Volume Discount | 61.39 € *Unit price with basic configuration Volume Discount | 402.32 € *Unit price with basic configuration | 140.97 € *Unit price with basic configuration Volume Discount | 402.32 € *Unit price with basic configuration | 343.09 € *Unit price with basic configuration |
Min. Shipping Days : | 8 Days | 8 Days | 8 Days | 8 Days | 8 Days | 8 Days | 8 Days |
Screw Types | Parallel for Pipes | Taper for Pipe | Taper for Pipe | Taper for Pipe | Taper for Pipe | Taper for Pipe | Parallel for Pipes |
Screw size (Nominal) | 3/8-19 | 3/8-19 | 3/8-19 | 3/8-19 | 3/8-19 | 3/8-19 | 3/8-19 |
Pitch (P), Number of Threading(mm) | - | - | - | - | - | - | - |
Chamfer threads (Lcf) | 3.5P | 2.5P | 2.5P | 2.5P | 2.5P | 2.5P | 3.5P |
Tool Material Type | Carbide | High-speed steel | High-speed steel | Carbide | High-speed steel | Carbide | Carbide |
work material | Cast Iron (FC)[○] / Ductile Cast Iron (FCD)[○] / Brass (Bs)[○] / Brass cast iron (BsC)[○] / Bronze (Pb)[○] / Aluminum Alloy Casting (AC, ADC)[○] / Zinc Alloy Casting (ZDC)[○] | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Tool Steel (Before SKD Hardening)[○] / Steel casting (SC)[○] / Cast Iron (FC)[○] / Ductile Cast Iron (FCD)[○] / Brass (Bs)[○] / Brass cast iron (BsC)[○] / Aluminum Alloy Casting (AC, ADC)[○] / Magnesium Alloy (MC)[○] / Zinc Alloy Casting (ZDC)[○] | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Steel casting (SC)[○] / Ductile Cast Iron (FCD)[○] / Brass cast iron (BsC)[○] | Cast Iron (FC)[○] / Ductile Cast Iron (FCD)[○] / Brass (Bs)[○] / Brass cast iron (BsC)[○] / Bronze (Pb)[○] / Aluminum Alloy Casting (AC, ADC)[○] / Zinc Alloy Casting (ZDC)[○] | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Tool Steel (Before SKD Hardening)[○] / Steel casting (SC)[○] / Cast Iron (FC)[○] / Ductile Cast Iron (FCD)[○] / Brass (Bs)[○] / Brass cast iron (BsC)[○] / Aluminum Alloy Casting (AC, ADC)[○] / Magnesium Alloy (MC)[○] / Zinc Alloy Casting (ZDC)[○] | Cast Iron (FC)[○] / Ductile Cast Iron (FCD)[○] / Brass (Bs)[○] / Brass cast iron (BsC)[○] / Bronze (Pb)[○] / Aluminum Alloy Casting (AC, ADC)[○] / Zinc Alloy Casting (ZDC)[○] | Cast Iron (FC)[○] / Ductile Cast Iron (FCD)[○] / Brass (Bs)[○] / Brass cast iron (BsC)[○] / Aluminum Alloy Casting (AC, ADC)[○] / Zinc Alloy Casting (ZDC)[○] |
Tap Type | Tap for pipes | Tap for pipes | Tap for pipes | Tap for pipes | Tap for pipes | Tap for pipes | Tap for pipes |
Hole type | For through hole / For blind hole | For through hole / For blind hole | For blind hole | For through hole / For blind hole | For through hole / For blind hole | For through hole / For blind hole | For through hole / For blind hole |
Coating Y/N | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Coating Type | - | - | - | - | - | - | - |
Overall Length (L)(mm) | 65 | 65 | 65 | 65 | 200 | 65 | 65 |
Loading...