Device Stands - Square Flanged with X-Axis Slotted Holes

Device Stands - Square Flanged with X-Axis Slotted Holes
  • Promotional pricing
  • Volume Discount
  • Order quantities extended (D-JIT)
  • Stock

(i)Remark

  • Please check the content on our website as the PDF does not contain the most up-to-date information.

Data sheet

Unit еxample related to this product

Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

Device Stands - Square Flanged with X-Axis Slotted Holes:Related Image

■Sets (Posts + Brackets)
TypePostBracketAccessory
Horizontal AdjustmentVertical Adjustment
SolidHollowSolidHollowMaterial HardnessSurface TreatmentMaterialSurface TreatmentSolidHollow
ASTXASPXASTYASPYEN 1.1191 Equiv. Induction Hardened-EN-JL 1040 Equiv.Black oxide or Phosphate Conversion CoatSet Screw
Hex Socket Head Screw
Washers
Set Screw
Hex Socket Head Screw
Washer
Caps
(P.2143)
AQTXAQPXAQTYAQPYEN 1.1191 Equiv.Electroless Nickel Plating
AMTXAMPXAMTYAMPYEN 1.1191 Equiv. Induction HardenedElectroless Nickel PlatingEN-JL 1040 Equiv.Electroless Nickel Plating
APTXAPPXAPTYAPPYEN 1.1191 Equiv.
ACTXACPXACTYACPYEN 1.4301 Equiv.-
* Case Induction Hardened (Post): 58HRC ~, Depth 1.0 ~ 1.5
* There may be no electroless nickel plating at ends and grooves of posts.
* For Hex Socket Head Cap Screws, a black oxide bracket matches a black oxide screw, and an electroless nickel plating bracket matches a trivalent chromate screw.
Surface treatment may not be applied to the inside of the slotted holes. The mounting pitch differs from the Square Flanged (P.2149).

■Bracket only
Type
Material
Surface Treatment
Accessory
Horizontal AdjustmentVertical Adjustment
ABFXABFYEN-JL 1040 Equiv.Black oxide or Phosphate Conversion CoatSet Screw
AMFXAMFYElectroless Nickel Plating

Specifications

Part Number-L
ASPX30
ABFY20
-400
Part NumberL 1mm IncrementAdj. RangeABFXFYGXGYKWD1(D3)HTM(d)[ A ]Accessories
Hex Socket Head Cap Screws
(Available as Set Only)
TypeDPostsg6BracketsH7
Set
Horizontal
Adjustment
Bracket only
Horizontal Adjustment
10-0.005
-0.014
+0.015
0
50~250±2.55630404014144.552628351118M46M4-20x4 pcs.
(Solid)
ASTX
AQTX
AMTX
APTX
ACTX
(Hollow)
ASPX
AQPX
AMPX
APPX
ACPX
ABFX

AMFX
12-0.006
-0.017
+0.018
0
50~300±2.56236444418185.552830351118M46M5-20x4 pcs.
15-0.006
-0.017
+0.018
0
75~350±37040505020206.663133401120M510M6-25x4 pcs.
20-0.007
-0.020
+0.021
0
75~400±58050566035256.6104043451125M511.7M6-25x4 pcs.
Vertical
Adjustment
Vertical Adjustment25-0.007
-0.020
+0.021
0
75~450±510060707536309104552501130M615.2M8-25x4 pcs.
(Solid)
ASTY
AQTY
AMTY
APTY
ACTY
(Hollow)
ASPY
AQPY
AMPY
APPY
ACPY
ABFY

AMFY
30-0.007
-0.020
+0.021
0
100~450±510660758036309105056601130M616M8-25x4 pcs.
35-0.009
-0.025
+0.025
0
125~500±7.5118808090504011155560701440M820.1M10-35x4 pcs.
40-0.009
-0.025
+0.025
0
150~500±7.5125808895504011156066801440M822.7M10-35x4 pcs.
50-0.009
-0.025
+0.025
0
200~600±10140100951067050142070771001450M1030.8M12-35x4 pcs.
For available sizes of the brackets, refer to the price list.
■Sets (Posts + Brackets)
DLUnit Price
SolidHollow
ASTX
ASTY
AQTX
AQTY
AMTX
AMTY
APTX
APTY
ACTX
ACTY
ASPX
ASPY
AQPX
AQPY
AMPX
AMPY
APPX
APPY
ACPX
ACPY
1050~150          
151~250          
1250~150          
151~300          
1575~200          
201~350          
2075~200          
201~400          
2575~200          
201~450          
30100~200          
201~450          
35125~300          
301~500          
40150~300          
301~500          
50200~300          
301~600          

■Bracket only
DH7ToleranceUnit Price
ABFXABFYAMFXAMFY
10+0.015
0
  --
12+0.018
0
    
15   -
20+0.021
0
    
25    
30    
35+0.025
0
    
40    
50    

Part Number:  

    3D preview is not available, because the part number has not yet been determined.

  • In order to open the 3D preview, the part number must be fixed.
Loading...
Part Number
AMPX10-[50-250/1]
AMPX12-[50-300/1]
AMPX15-[75-350/1]
AMPX20-[75-400/1]
AMPX25-[75-450/1]
AMPX30-[100-450/1]
AMPX35-[125-500/1]
AMPX40-[150-500/1]
AMPX50-[200-600/1]
AMPY10-[50-250/1]
AMPY12-[50-300/1]
AMPY15-[75-350/1]
AMPY20-[75-400/1]
AMPY25-[75-450/1]
AMPY30-[100-450/1]
AMPY35-[125-500/1]
AMPY40-[150-500/1]
AMPY50-[200-600/1]
AMTX10-[50-250/1]
AMTX12-[50-300/1]
AMTX15-[75-350/1]
AMTX20-[75-400/1]
AMTX25-[75-450/1]
AMTX30-[100-450/1]
AMTX35-[125-500/1]
AMTX40-[150-500/1]
AMTX50-[200-600/1]
AMTY10-[50-250/1]
AMTY12-[50-300/1]
AMTY15-[75-350/1]
AMTY20-[75-400/1]
AMTY25-[75-450/1]
AMTY30-[100-450/1]
AMTY35-[125-500/1]
AMTY40-[150-500/1]
AMTY50-[200-600/1]
ASPX10-[50-250/1]
ASPX12-[50-300/1]
ASPX15-[75-350/1]
ASPX20-[75-400/1]
ASPX25-[75-450/1]
ASPX30-[100-450/1]
ASPX35-[125-500/1]
ASPX40-[150-500/1]
ASPX50-[200-600/1]
ASPY10-[50-250/1]
ASPY12-[50-300/1]
ASPY15-[75-350/1]
ASPY20-[75-400/1]
ASPY25-[75-450/1]
ASPY30-[100-450/1]
ASPY35-[125-500/1]
ASPY40-[150-500/1]
ASPY50-[200-600/1]
ASTX10-[50-250/1]
ASTX12-[50-300/1]
ASTX15-[75-350/1]
ASTX20-[75-400/1]
ASTX25-[75-450/1]
ASTX30-[100-450/1]
Part Number
Standard Unit Price
Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSSeparate/Set Item Post Type Post Hole Dia. D
(mm)
Bracket Surface Treatment Post Material Post Surface Treatment Post Thermal Treatment Sale Type Slotted Hole Direction L
(mm)

-

1 7 Days 10SetTubes10Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount50 ~ 250

-

1 7 Days 10SetTubes12Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount50 ~ 300

-

1 7 Days 10SetTubes15Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount75 ~ 350

-

1 7 Days 10SetTubes20Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount75 ~ 400

-

1 7 Days 10SetTubes25Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount75 ~ 450

-

1 7 Days 10SetTubes30Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount100 ~ 450

-

1 7 Days 10SetTubes35Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount125 ~ 500

-

1 7 Days 10SetTubes40Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount150 ~ 500

-

1 7 Days 10SetTubes50Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount200 ~ 600

-

1 7 Days 10SetTubes10Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount50 ~ 250

-

1 7 Days 10SetTubes12Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount50 ~ 300

-

1 7 Days 10SetTubes15Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount75 ~ 350

-

1 7 Days 10SetTubes20Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount75 ~ 400

-

1 7 Days 10SetTubes25Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount75 ~ 450

-

1 7 Days 10SetTubes30Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount100 ~ 450

-

1 7 Days 10SetTubes35Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount125 ~ 500

-

1 7 Days 10SetTubes40Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount150 ~ 500

-

1 7 Days 10SetTubes50Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount200 ~ 600

-

1 7 Days 10SetSolid10Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount50 ~ 250

-

1 7 Days 10SetSolid12Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount50 ~ 300

-

1 7 Days 10SetSolid15Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount75 ~ 350

-

1 7 Days 10SetSolid20Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount75 ~ 400

-

1 7 Days 10SetSolid25Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount75 ~ 450

-

1 7 Days 10SetSolid30Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount100 ~ 450

-

1 7 Days 10SetSolid35Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount125 ~ 500

-

1 7 Days 10SetSolid40Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount150 ~ 500

-

1 7 Days 10SetSolid50Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetSide Mount200 ~ 600

-

1 7 Days 10SetSolid10Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount50 ~ 250

-

1 7 Days 10SetSolid12Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount50 ~ 300

-

1 7 Days 10SetSolid15Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount75 ~ 350

-

1 7 Days 10SetSolid20Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount75 ~ 400

-

1 7 Days 10SetSolid25Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount75 ~ 450

-

1 7 Days 10SetSolid30Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount100 ~ 450

-

1 7 Days 10SetSolid35Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount125 ~ 500

-

1 7 Days 10SetSolid40Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount150 ~ 500

-

1 7 Days 10SetSolid50Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingInduction HardenedSetVertical Mount200 ~ 600

-

1 7 Days 10SetTubes10[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount50 ~ 250

-

1 7 Days 10SetTubes12[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount50 ~ 300

-

1 7 Days 10SetTubes15[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount75 ~ 350

-

1 7 Days 10SetTubes20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount75 ~ 400

-

1 7 Days 10SetTubes25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount75 ~ 450

-

1 7 Days 10SetTubes30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount100 ~ 450

-

1 7 Days 10SetTubes35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount125 ~ 500

-

1 7 Days 10SetTubes40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount150 ~ 500

-

1 7 Days 10SetTubes50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount200 ~ 600

-

1 7 Days 10SetTubes10[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount50 ~ 250

-

1 7 Days 10SetTubes12[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount50 ~ 300

-

1 7 Days 10SetTubes15[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount75 ~ 350

-

1 7 Days 10SetTubes20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount75 ~ 400

-

1 7 Days 10SetTubes25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount75 ~ 450

-

1 7 Days 10SetTubes30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount100 ~ 450

-

1 7 Days 10SetTubes35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount125 ~ 500

-

1 7 Days 10SetTubes40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount150 ~ 500

-

1 7 Days 10SetTubes50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetVertical Mount200 ~ 600

-

1 7 Days 10SetSolid10[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount50 ~ 250

-

1 7 Days 10SetSolid12[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount50 ~ 300

-

1 7 Days 10SetSolid15[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount75 ~ 350

-

1 7 Days 10SetSolid20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount75 ~ 400

-

1 7 Days 10SetSolid25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount75 ~ 450

-

1 7 Days 10SetSolid30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Not ProvidedInduction HardenedSetSide Mount100 ~ 450

Loading...

Basic information

Mounting Direction Vertical Mount Type Stand Bracket Type Square Flanged Post Shape Round
Bracket Material EN-JL 1040 Equiv. Post Fixing Method Set Screw Mounting Hole Shape Slotted Hole
Post Fixing Accessories Set Screw Dowel Holes Not Provided

Complementary Products

MISUMI Unit еxample related to this product

Tech Support